Egyptian Swiss Development Fund (ESDF), “Integrated Development with
Emphasis on Water and Sanitation”Project, 2002 – Now
A contract
with “Egyptian Swiss Development Fund” to conduct Social, Population,
Economical, and Environmental Studies for 16 villages in “Itsa”
District-Fayoum Governorate and capability assessment of 16 Community
Development Associations CDAs/NGOs for building their capacity to take
rule in Developing the communities in Markaz Itsa.More
Details.
Ministry
of Housing, Public Utilities, and Urban Communities, Urban Communities
Organization: Updating the Water & Wastewater Master Plan
Project. 2001 – Now
The First
Axis Cities, Economic, Social, and Population Studies: First field
study that elapsed for more than 6 months for 10th of
Ramadan, 6th of October, Badr, Al Shrouk, Al- Abour, 15th
of May, Al Kahera Al-Gedida, Al Shiekh Zayed, and Alremaiah Square
cities.More
Details.
Kafr Elshekh Road
(Desouk-Damanhour) 2003
A feasibility
Study have been made for
Kafr Elshekh Road
(Desouk-Damanhour), which consist of three sectors
More Details
Telecordia Technology / Allied Corporation - Telecom Egypt (TE);,
“Business Transformation Project” 2002 – Jan 2003
Dr. Ali is
seconded to the project in the capacity of senior management
consultant
Responsibilities include:
-
Prepare and conduct ISDN and VAS
Relaunch training program (2520 training hours) for the commercial
office reps, and exchange managers.
-
Give advice and backstop in the
services processes reengineering
-
Assist in the overall relaunch
program of TE services
-
Lead the relaunch program for the
Business services (x.25, LL, FR, ISDN Pri)
Telecordia
Technology / Allied Coroporation - Telecom Egypt (TE); 3rd
Mobile License, “Mobile Business Case and Network Design –
Market Opportunity Assessment”. 2001 – FEB. 2002
Dr. Ali is
seconded to the project in the capacity of senior management
consultant
Responsibilities include:
Ministry of Interior, Project “Integrated Population Area”, Cairo/
Alex desert high way cross with 26th July Axis at Km 10.5. (2001)
Subcontract
with AAW, the main Contractor, Economical Studies and Investment Cost
of the project.More
Details.
Reengineering The Kuwaitie United Company for Advertising, Publishing
and Distribution (Al-Waseet). Kuwait. 2000- to date
Allied in association with Projacs International conduct a
reengineering project for Al-Waseet company. The project consists of
six phases, namely, the diagnostic study, the strategic planning, the
reorgnization, reengineering the main processes, systems development,
and human resources development. The first two stages are
consecutive while the other four are simultaneously implemented with
the last stage to start at the outset of the project and to finish
with the its completion.
More Details
Training Needs Assessment for The Ministry of Irrigation and Water
Resources (MOIWR). 2000 – July 2000
USAID Project, Development Training 2
(DT2). Institute of International Education (IIE). Preparing the
Training Needs Assessment (TNA) for the Ministry of Irrigation and
Water Resources (MOIWR).
USAID Project; “Management
Improvement Program” (TSN 512). 1999 – 2000
USAID
Project, Development Training 2 (DT2). AMIDEAST, under a subcontract
to the Institute of International Education (IIE). Dr. Ahmed Ali, the
founder and Managing Director of Allied, in the capacity of senior
management consultant, was seconded to AMIDEAST for the Telecom Egypt,
Management Improvement Program (TSN 512).
USAID project; “Development of Craft Certification System”. 1998 –
DEC. 1999
USAID project “Development of Craft
Certification System” the beneficiary is the Federation of Egyptian
Industries (FEI). The project aims at establishing a Craft
Certification System to be utilized as an effective tool to train,
qualify, and certify the technical workforce in the industrial
community members of the FEI. Subcontractor to MEAG, the main
contractor, with the capacity implementing the project’s four stages:
-
The needs assessment,
-
The presentation; selection of the
crafts
-
The development of craft
certification manuals, and
-
The identification of an
international certification body.More Details
Mobinil.
1998 – 1999
Dr. Ahmed Ali, in the capacity of
senior management consultant, was seconded to the leading and
largest telecommunication company in
Egypt; Mobinil with the following
Responsibilities:
1.
Giving advice
and backstops in HRD area.
2.
Design and prepare “customer care”
training program company- wide: target groups include; Customer
care via telephone, Face-to-face customer care, Help-line customer
care, Telemarketing, etc.
3.
Conducting
more than 1800 training contact hours so far.
USAID project; “GreenCOM III Egypt”.
1998 – SEPT.1999
USAID contract No.
PCD-Q-802-93-0069-00, Environmental Education & Communication
Project (GreenCOM III Egypt), subcontractor to Chemonics International
as a Local Training Specialist. with the following Responsibilities:
-
Work with the WCU Field Services
Team and the Field Worker Training Specialist to design & plan
activities for engineers to carry out in the field during the
Reinforcement Period.
-
Assist the WCU Field Service Team to
implement the Reinforcement Plan.
-
Assist the WCU Field Service Team to
monitor and evaluate the Reinforcement Plan.More Details
USAID Project; “GreenCOM III Egypt”.
1998 – SEPT.1999
USAID contract No.
PCE-5839-Q-00-3069-00, Environmental Education & Communication Project
(GreenCOM III Egypt), Subcontractor to MEAG, the main contractor, with
the capacity of implementing the following:
-
Leading a team to design and develop
the management training program for the district engineers.
-
Leading a team to design and develop
the management training program for the inspectors, and their
supervisors.
-
Design and develop the
management-training program for the senior managers in the MOPWWR,
Irrigation Authority.
-
Conducting the program seminars,
completing 20,362 training contact hours.
-
Design and conduct a follow-up
program.
Feasibility studies inside Egypt and in the Gulf Area. 1988 – to
date.
1. Economic
feasibility study. “Development of Dahab City", South of Sinai
Governorate. 1997.
2. Economic
feasibility study for the third and fourth stages of the Industrial
City of Tenth of Ramadan. 1996.
3. Economic
feasibility study for “ protection of Ras El-Nakab – Nweaba’a road
from
flooding danger”. 1993.
4. Economic
feasibility study for “Protection of Nea’ma gulf at Sharm –El–shiek
city from flooding danger, and utilization of flooding water in
different development aspects”. 1993.
5.
Economic
feasibility study “ Establishment of Al-madina El-monoura Industrial
City, Kingdom of Saudi Arabia,
Ministry of Electricity, Department of Industrial Cities. 1992.
6.
Economic
feasibility study. “ Upgrading of the
hot springs in Gizan Area, Kingdom of
Saudi Arabia, Ministry of Municipality affairs. 1992.
7.
Economic
feasibility study “Using raw water to irrigate the green areas of the
touristic villages along the
Northwestern Coast”. 1990.
8.
Economic
feasibility proposal “ Establishment of a comprehensive water and
wastewater management program in touristic communities (Hurgada, Sahel-hashish,
Ras Abu Soma). Tourism Development Unit, Ministry of Tourism. 1989
USAID project; “Administration of
Justice Support Project (AOJSP)”
1997 – 1998
AMIDEAST,
as a senior management consultant for the Administration of Justice
Support Project (AOJSP) – USAID project # 263-0243-C-00-5134-00 – to
enhance the administrative and management capabilities of the National
Center for Judicial Studies (NCJS)
The USAID Project; “Partnership In Development, PID”1996 – 1997
The USAID
Project, “Partnership In Development, PID”. Subcontractor to AAW under
subcontract # AA-1061-01 to Arthur Anderson LLP. Leading a team work
to conduct the technical valuation and evaluation of entities to be
privatized for the Egyptian Industries Holding Companies,
Responsibilities included:
-
Collecting, reviewing, and
evaluating available physical and financial data including Field
work (e.g. site visits and meetings).
-
Collection and verification
including inspecting the existing fixed assts.
-
Reviewing existing production and
maintenance systems.
-
Describing the primary process used
in production using the Structure Analysis and Design Technique (SADT).
-
Identifying the raw material,
consumables, and spare parts used in the production.
-
Identifying the company’s method of
distribution, the production cycle time, the production constraints,
nominal capacity, actual capacity, and performance norms.
-
Conducting a survey of land,
buildings, production, material and utility equipment including the
development of the replacement cost and depreciated replacement cost
for the company’s assets.
-
Developing alternative scenarios to
privatize the company
USAID Project; Institutional
Support Contact (ISC). 1992
– SEPT.1998
Dr. Ahmed
Ali, the founder and Managing Director of Allied, was
Seconded to Team Miser in association of CH2M HILL/OMI as a Senior
Management Consultant and Human Resources Development Specialist for
Institutional Support Contact (ISC) at Cairo General Organization for
Sanitary Drainage (GOSD) – USAID project # 263-92-027.
Responsibilities included:
-
Member of the Project Management
Team (PMT)
-
Reengineering GOSD selected work
processes.
-
Establishing a management-training
program for top and middle management levels with he objectives of
developing needed performance improvement and managerial skills
within (GOSD).
-
Establishment of the Cascaded
Management Training Program (CMTP) for the second managerial levels
(mostly technical people).
-
Leading counterpart program and
management seminars.
-
Leading the reorganization team to
implement the state-of-the-art organization change principles
throughout the reorganization process.
-
Leading the industrial flow
monitoring and enforcement task team to revise the existing
regulations.
-
Leading the Strategic Planning
process.
Interim Evaluation of Cairo
Sewerage II.
1991 – 1992
Dr. Ahmed Ali, the founder and Managing
Director of Allied, was
Seconded to AAW under subcontract to SACG incorporated as public
utility specialist for Interim Evaluation of Cairo Sewerage II at
Cairo General Organization for Sanitary Drainage (GOSD), USAID Project
# 263-0173.
Responsibilities included:
-
Evaluating the adequacy of budgets
and tariffs established by CWO/GOSD and Ministry of Housing and
Public Utility for Sanitary Drainage Service.
-
Determining the economic,
environmental, and efficient operations of sludge disposal.
-
Assessing in the process of the
commodity procurement under the project and extent of procurement
and source/origin requirement.
USAID
Project; Water and Waste
water Institutional Support Project (WWISP) 1989 – 1991.
Dr. Ahmed
Ali, the founder and Managing Director of Allied, was
Seconded AAW under subcontract to Boyel Engineering corporation and
National Education Corporation (NEC) as an economist for Water and
Waste water Institutional Support Project (WWISP) at the National
Organization for Potable Water and Sanitary Drainage (NOPWASD); USAID,
Project # 263-0176
Responsibilities included:
-
Establishing of a management
Development for Economics Program (MDEP) to develop an economic
analysis capability within (NOPWASD.
-
Assisting in initiating a
counterpart program.
-
Leading Financial Seminars to cover
topics such as: Feasibility Study, Financial Planning, and
Managerial economics.
|